







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Denton Owner’s Guide
We install CGI-compatible home additions and ADU packages in Denton, and a finished addition typically runs $45,000 to $130,000. A detached ADU built to Denton’s accessory-dwelling rules runs $90,000 to $220,000, and a garage conversion sits at $30,000 to $80,000. This is planned construction, not emergency work, so scheduling follows permitting and inspection timelines rather than a same-day dispatch.

Owners usually land here after the first phase of a CGI-based build goes sideways. A subcontracted framer walks off mid-rough-in. The sheathing or the tie-in to the existing house doesn’t match the plans that were stamped at the city. Or an owner buys a CGI kit or panel package expecting it to bolt onto any Denton lot and finds the plate dimensions don’t line up with their slab. This page covers what actually matters: what fits, what fails, what it costs, and how to get it squared away.
Which CGI Models This Applies To

CGI doesn’t publish a single universal addition system. Packages are usually specified per project: panelized walls, roof trusses, subfloor systems, foundation interface hardware, and the connectors that tie new framing into existing structure. Identifying the right components means reading the plan set and the shop drawings, not matching a part number off a box. The label you need lives on the plan sheet or the panel tag, and it references the panel series, span, and load rating for that specific build.
That’s the compatibility gotcha nobody mentions up front: any part carrying a structural load in a Denton addition has to be signed off against a Texas-engineered plan set and pass city inspection. A component rated for one span in one series does not swap cleanly into another. Where an OEM match is slow or expensive, a quality aftermarket equivalent with the same load rating and certification is often the honest answer. We check the span and the certification first, then source. We’re an independent remodeling company, not affiliated with CGI.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
The part itself rarely fails in isolation. What fails is the interface: how the addition meets the existing house, the slab, and the weather. Watch for these.
- Roof-to-wall separation. A gap or daylight where the new roof plane meets the original wall means the flashing and tie-in have failed. In Denton’s spring hail and wind events, that junction takes the worst of it.
- Water staining at the foundation sill. Moisture tracking along the sill plate points to a failed sill seal or missing capillary break. North Texas clay soils swell and shrink with the seasons, and a sill that isn’t protected moves with them.
- Sticking doors and hairline drywall cracks. These signal framing movement, often from an under-designed header or a span that wasn’t checked against the plan. New framing that settles more than the original house shows up here first.
- Reduced insulation performance or cold walls. A wall cavity that loses its seal at the panel joint lets Denton’s summer heat straight through. Look for condensation on interior wall faces in humid months.
- Panel or truss connections backing out. Loosened connectors on the roof trusses mean the fastening schedule wasn’t followed. This is a structural concern and worth a professional look before it gets worse.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Denton addition work lands in these ranges. A full home addition runs $45,000 to $130,000, an ADU build $90,000 to $220,000, and a garage conversion $30,000 to $80,000. The range moves on square footage, foundation type, whether you’re tying into existing plumbing and electrical, and how much of the existing structure needs correcting before the new work goes up.
- Home addition: $45,000 – $130,000
- ADU construction: $90,000 – $220,000
- Garage conversion: $30,000 – $80,000
Every Bradford project gets a written price before any work starts, broken into line items so you can see parts versus labor. Permits are pulled and inspections passed. Every finished project carries the 365-Day Done Right Promise: if the work fails inside a full year, we come back and correct it at no charge. You get a written price and a signed guarantee, in hand, at close.

DIY or Call Us?
An owner can safely check a few things: confirm the panel and truss tags against the plan set, photograph any water staining, and note where doors and windows are sticking. Those observations help us scope the job before we arrive.
What you shouldn’t do yourself is anything structural. Cutting a header, reflashing a roof tie-in, or altering a load-bearing connection on an addition is where DIY goes wrong fast, and on a Denton build it means an inspection failure and a redo. Tying a new addition into an existing house is height, load, and weather work. That calls for a trained, background-checked crew who knows Denton’s permitting and inspection sequence. Give us a call at (844) 651-3175 and we’ll walk it through with you.
FAQs

Built to plan and inspected properly, a Denton addition or ADU should stay weathertight for decades. The lifespan hinges on the flashing and roof tie-in, which take a beating from North Texas hail and wind, and on the slab interface, where our clay soils move seasonally. Get those junctions right and the structure holds.
Sometimes. A loosened connector or a worn sill seal can be corrected without tearing out the addition. But once water has tracked into the framing or a load-bearing connection has been compromised, repair becomes risky and replacement is the honest answer. We look at the span and the damage before we recommend either. Call (844) 651-3175 for a free estimate.
A garage conversion typically runs several weeks; a full addition or detached ADU takes longer because it moves through Denton permitting and multiple inspections. We give you a written schedule up front so you know what stage comes next. The exact timeline depends on scope and permitting, and we’ll be direct about it.
We read the plan set and the panel or truss tags, confirm the load rating and certification, then source the OEM match or a certified aftermarket equivalent. We work from a documented roster of name-brand materials, and we also handle KraftMaid, Cambria, and Silestone finishes when the addition includes cabinetry or surfaces. Every spec is traceable.
If your Denton addition or ADU needs a straight answer on scope and a real number, call Bradford Remodeling Co Denton at (844) 651-3175 for a free estimate. You’ll get a written price before any work starts, a crew you know is coming, and the 365-Day Done Right Promise behind every repaired and finished project.
Written by the team at Bradford Remodeling Co Denton, serving Denton and nearby areas.












