







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The Denton Owner’s Guide
Additions and ADU work tied to a Mr-Glass plan set in Denton typically runs $45,000 – $130,000 for a home addition, while a full ADU build lands between $90,000 – $220,000 and a garage conversion between $30,000 – $80,000. Unlike a hardware part, a Mr-Glass addition isn’t a component that fails and gets swapped – it’s a construction scope, so the “failure” shows up as a plan that never got built, a foundation that wasn’t squared to the plan set, or a shell that was framed but never closed out. That’s usually when a Denton homeowner calls us, holding a Mr-Glass drawing package and a contractor who stopped returning calls. We’re an independent contractor and not affiliated with Mr-Glass, but we build to their plans and specs, and we put the full scope and price in writing before a single tool comes out.

Which Mr-Glass Models This Applies To

Mr-Glass plan packages show up in Denton under several labels, and identifying the right drawing version matters more than most owners realize. The plan number and revision letter (often near the title block on sheet one) tell you which structural and energy details apply – a “Rev A” from an earlier code cycle can specify framing and insulation that no longer passes Denton’s current inspection, so matching the build to the correct revision is the first thing we check.
How to identify what you actually have:
- Title block: Look for the plan name, the revision letter, and the sheet count. Missing sheets usually means the foundation or MEP (mechanical, electrical, plumbing) pages were separated and lost.
- Square footage and footprint callouts: These drive material takeoffs and permit fees, and a mismatch between the drawing and the lot survey is a common snag.
- Stamped engineer’s page: If the structural sheet isn’t stamped for Texas, we’ll flag it before we price.
On the OEM-vs-alternative decision: with a plan package, there’s no aftermarket “equivalent part.” What you choose instead is the material spec behind each line – cabinets, surfaces, exterior cladding – and matching those to a documented brand roster is how we keep the build traceable. We won’t tell you a Mr-Glass drawing locks you into one supplier; we will show you exactly which spec lines are open and which aren’t.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Home Additions & ADU Is Failing
An addition doesn’t “fail” the way a lock or hinge does – the failure is in the process around it. Here’s what we see most in Denton:
- Framing up, nothing closed in. The shell got built but the dry-in, windows, and exterior finish stalled – often because the original crew walked and the next one won’t touch another’s framing. Every month open to North Texas weather pushes water into the substrate.
- Foundation out of square to the plan. The slab or pier layout doesn’t match the Mr-Glass footprint, so door and window rough openings land wrong. That’s a layout error, not a part defect, and it has to be corrected before finish work.
- Permit expired or never pulled. Denton permits carry expiration windows, and a lapsed permit means inspections weren’t passed. That stops a sale cold and has to be resolved before anything is finished.
- Energy details skipped. Insulation and air-sealing specified on the drawing aren’t in the wall – common on a stalled job, and it shows up as a room that won’t hold temperature through a Texas summer.
- No written scope, no close-out. The previous contractor gave a verbal number and no documents, so you can’t tell what was finished or what’s covered. Without a signed written scope, the guarantee is whatever they remember.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For Denton, plan on $45,000 – $130,000 for a Mr-Glass home addition, $90,000 – $220,000 for a full ADU, and $30,000 – $80,000 for a garage conversion. The range moves on footprint, foundation type, whether the shell is already standing, and how much of the existing rough-in can be reused.
| Scope | Installed Range (Denton) |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What’s included and how it’s handled:
- Written line-item price before work starts – every scope line priced, no numbers that move at the door.
- Permits pulled and inspections passed as part of the scope.
- Documented materials from a traceable brand roster – KraftMaid, Cambria, Silestone, and others – so specs and warranties are on record.
- 365-Day Done Right Promise: every completed project carries a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge.
DIY or Call Us?
Some of this you can safely check yourself. Pull your Mr-Glass plan set and confirm the revision letter and sheet count. Read your survey against the drawing to see if the footprint lines up. Look up your permit status with the city of Denton. Those three steps tell you where you stand without touching a tool.
Where DIY goes wrong here is the construction itself. Addition and ADU work involves foundation, framing, and electrical and gas rough-in – genuinely dangerous components where a mistake isn’t cosmetic, it’s a safety and inspection problem. This isn’t a part you swap on a Saturday; it’s permitted structural work that has to pass inspection. If a shell is sitting open to the weather, the priority is getting it dried in and documented, not finishing it yourself. Call (844) 651-3175 and we’ll review the plan set, tell you what’s salvageable, and give you a written scope. Estimates are free.
FAQs

How long should a Mr-Glass addition or ADU last in Denton?
A properly built addition is a decades-long structure – 50 years or more with sound foundation, framing, and dry-in. Lifespan hinges on the details: correct foundation for North Texas clay soil, proper flashing, and passing inspections. Call (844) 651-3175 for a written scope that holds up.
Can a stalled Mr-Glass addition be repaired instead of rebuilt?
Often yes. A framed shell that was dried in and inspected correctly can usually be finished rather than torn down – we assess foundation, framing, and permit status first, then price the completion work. If the foundation is out of square or the permit lapsed, the scope changes. Call (844) 651-3175 for an honest read before you commit.
How long does it take to finish a Mr-Glass addition or ADU?
A home addition typically runs several months from permit to close-out, and a full ADU runs longer – the timeline depends on whether the shell exists, inspection schedules, and material lead times. We give you the schedule in writing up front. Call (844) 651-3175 to get your project scoped.
How do you source materials for a Mr-Glass build?
We work from a documented roster of name-brand materials – KraftMaid and Wellborn cabinetry, Cambria and Silestone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors – so every spec is traceable and backed by manufacturer warranties on top of our own 365-Day Done Right Promise. Call (844) 651-3175 and we’ll walk you through the spec lines on your plan.
Bradford Remodeling Co Denton is a member of the Garrison Partners family, held to The Garrison Standard: a written price before any work starts, background-checked and uniformed technicians on every job, and a live person answering the phone 24/7. Call (844) 651-3175 for a free estimate on your Mr-Glass addition or ADU in Denton.
Written by the team at Bradford Remodeling Co Denton, serving Denton and nearby areas.












