







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cover Home Additions & ADU: The Denton Owner’s Guide
Home additions and ADU projects in Denton that are built to line up with your existing Cover structure typically run $45,000 – $130,000 installed, and a full ADU build runs $90,000 – $220,000. We build that price in writing before we touch a single board, and it doesn’t change at the door. This page is for Cover owners whose addition or ADU has a failed or failing connection point, roofline, substrate, or rough-in, and who need to know what’s compatible, what it costs, and how to get it squared away.

The typical discovery moment: a window in the new wing leaks after a north Texas storm, a ceiling seam shows hairline cracks, or the roofline where the addition meets the original Cover envelope starts showing water stains. For ADU owners the warning often comes from a utility rough-in that wasn’t run to spec, or from a foundation that’s settled differently than the main house.
Key Takeaways
- Addition installed: $45,000 – $130,000. ADU installed: $90,000 – $220,000. Garage conversion: $30,000 – $80,000.
- Written price before any work begins, every time. It’s part of The Garrison Standard.
- The 365-Day Done Right Promise covers every completed project: if the work fails inside a full year, we come back and correct it at no charge.
- Denton’s expansive clay soils move the way covered structures aren’t always built to handle. That’s a real compatibility factor, covered below.
Which Cover Models This Applies To

The short answer is that additions and ADU work touches every Cover residential line, because the failure is rarely in the Cover product itself. It’s in the junction where the addition meets the original structure: the roofline tie-in, the foundation transition, the exterior envelope, or the utility rough-in running through a converted space.
You’ll want to identify what you’re actually dealing with before pricing anything. Two things to look for:
- The junction label. Cover structures built onto an existing home often carry a junction tag or manufacturer label near the tie-in point, typically on the inside face of the wall or under the soffit. Photograph it. It tells you the series and the envelope spec your addition has to match.
- The measurement reality. Measured walls that come within an eighth of an inch of the original Cover envelope are a very different job than walls that are out by a quarter inch or more. Denton’s clay soils make this a live question on any addition past a few years old.
On the OEM-versus-aftermarket question for Cover specifically: for structural tie-ins, envelope materials, and the foundation transition, we specify original-equivalent materials every time. There’s no honest aftermarket shortcut for a load path. For finishes and interior materials, you have real choices. We work with a documented roster of name-brand products – KraftMaid and Wellborn cabinetry, Cambria and Silestone surfaces, Kohler and Moen fixtures, GAF and James Hardie exterior products, Therma-Tru doors – so the specification on your addition is traceable to a manufacturer spec sheet, not a phone call from a job site.
We’re an independent service provider, not affiliated with Cover. What that means for you: our recommendations are based on what actually fits your Cover model and the Denton site conditions, not on what a brand tells us to sell.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Cover Home Additions & ADU Is Failing
These five are the symptoms we see most often on Denton additions and ADUs. Each one has a specific cause behind it, and knowing the cause is half the estimate.
- Hairline cracks along the new wall seam. The addition’s framing has moved differently from the original Cover structure, usually because the foundation was poured or prepped differently. Clay soil in Denton expands and contracts seasonally, and a junction that didn’t account for that will show it within the first two years.
- Water staining at the roofline tie-in, especially after a north Texas storm. The flashing and soffit detail where the new roof meets the Cover envelope was under-specified or dressed wrong. This is the single most common Call we get on additions, and it gets worse every season it’s left.
- Interior moisture or mustiness in the new wing or ADU. Envelope flashing and the wall assembly aren’t venting the way they need to. North Texas humidity doesn’t forgive a tight envelope with no path for moisture to leave.
- Uneven floors or sticking doors in the addition. The foundation transition is settling at a different rate than the main house. On converted garages and detached ADUs in Denton, slab movement is a real thing to catch early.
- Utility rough-ins that don’t meet code on inspection. Electrical, plumbing, or a gas line run through the addition or ADU wasn’t done to spec. This is one you can’t safely diagnose yourself, and it’s a genuine hazard. More on that below.
Replacement Cost & What’s Included

Here’s the installed price range for Denton, with the line items that drive it:
| Project | Installed Range |
|---|---|
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion | $30,000 – $80,000 |
What drives the number up or down: the scope of the envelope tie-in, whether the foundation needs prep or repair, how much of the existing structure can stay, the footprint and complexity of the roofline, and the utility work involved in an ADU or garage conversion. A straight addition where the framing and foundation are already sound sits toward the bottom of the range. A full ADU build with new utilities, foundation, and envelope sits at the top.
The price covers the labor and materials, and we put the parts-plus-labor breakdown in writing before we start. Materials are itemized. No number on the quote moves at the door. Every completed project carries the 365-Day Done Right Promise: a full-year written guarantee, and if the work fails inside that window, we come back and fix it at no charge. That’s the whole term, and it’s in your hand at job close.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Here’s the honest split. What you can safely do yourself: photograph the junction label under the soffit, note exactly where the water stains or cracks are, take measurements, and document dates and weather. A homeowner who hands us good photos and a clear description saves us a site visit and saves themselves the back-and-forth.
What you should not touch: the utility rough-ins, the electrical or gas line through the addition or ADU, and any structural tie-in work. Those are genuinely dangerous, and a mistake on a gas line or an electrical panel isn’t a repair – it’s a hazard that could hurt someone. We don’t give step-by-step instructions for those because we don’t want you doing them. That’s a job for a trained, background-checked technician.
If you’re not sure where the failure is, that’s fine. Call us and we’ll tell you what we see. (844) 651-3175 – a live person answers, day or night, and estimates are free.
FAQs

A properly built addition should hold its envelope and framing for decades; the seam is what fails first, usually within the first five to ten years if the soil movement wasn’t accounted for. The 365-Day Done Right Promise covers the first full year after completion, which is when most junction failures show up. Call (844) 651-3175 for an exact quote on yours – the estimate is free.
Often yes. A leaking roofline tie-in or a hairline seam crack is usually a repair, not a full teardown. Foundation transitions and envelope moisture sometimes require more. We’ll tell you which one it is in writing, with a price, before anything starts. Call (844) 651-3175 and we’ll walk you through it.
A targeted repair on a failing junction or envelope typically takes a few days. A full addition or ADU build takes weeks to months depending on scope and permits. You’ll have the schedule in writing with the price. Call (844) 651-3175 for a scope-specific estimate.
We specify original-equivalent materials for structural tie-ins and name-brand products for finishes, sourced from a documented roster including KraftMaid, Cambria, and Silestone, among others. Every material has a manufacturer spec sheet, so the specification is traceable. Call (844) 651-3175 to talk through your project – estimates are free and the price is in writing before work begins.
Get Your Free Estimate
If you’re in Denton and your Cover addition or ADU is showing a failing seam, a leaking roofline, or a rough-in that didn’t pass inspection, call (844) 651-3175 to schedule your free estimate. We answer live, 24 hours a day. You’ll get a written price before any work starts, a documented scope, a clean site at close, and the 365-Day Done Right Promise signed in your hand when the job is done.
Written by the team at Bradford Remodeling Co Denton, serving Denton and nearby areas.












