A Bradford company - serving Denton, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Tub-to-Shower Conversion Cost in Denton - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Denton
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A powder room with botanical wallpaper and a stone sink
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled primary suite with built-in wardrobes and a window seat
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Tub-to-Shower Conversion Cost in Denton?

A tub-to-shower conversion in Denton typically runs $3,500 to $10,000, with most homeowners landing somewhere between $5,200 and $7,800 for a standard alcove swap using a tile-ready pan, a framed glass door, and a Kohler or Moen valve set. The number that matters isn’t the average – it’s the written price for your specific bathroom, handed to you before a single tool comes out.

Denton has a wrinkle worth knowing about up front. A large share of the city’s housing stock was built between 1970 and 2000, and much of that plumbing sits in cast iron drains and copper supply lines that were sized for a tub filler, not a shower valve. When we open a wall in a home near Southridge or the older streets off University Drive, the findings behind the drywall are usually what moves a job off the low end of the range. That’s not a sales pitch – it’s what a sober estimate has to account for.

Key Takeaways

  • Typical Denton range: $3,500 to $10,000; the middle of the market sits near $5,200 to $7,800.
  • What drives the price: drain relocation, wall substrate condition, tile selection, glass style, and whether the valve is behind a wet wall.
  • Timeline: most conversions finish in 3 to 5 working days once demolition starts, provided materials are on site.
  • Written price: Bradford Remodeling Co Denton hands you a fixed number before work begins, backed by the 365-Day Done Right Promise – if the finished work fails within a full year, we return and correct it at no charge.
  • Live answer: a real person picks up the phone 24 hours a day at (844) 651-3175. No voicemail, no callback queue.
A tile setter installing wall tile in a shower

Tub-to-Shower Conversion Cost Breakdown (2026)

Here’s how the $3,500 to $10,000 range breaks down in the Denton market. These are line-item ranges for a standard 60-inch alcove conversion. A like-for-like swap in a bathroom in good condition lands at the bottom; a conversion that re-routes the drain, rebuilds the substrate, and adds a frameless glass enclosure climbs toward the top.

Line Item Typical Denton Price What It Covers
Demolition & tub removal $300 – $800 Pulling the tub, hauling it off, opening the surround down to studs
Rough-in plumbing (valve & drain) $600 – $2,000 New shower valve, trim, and drain relocation if the tub drain isn’t already centered
Backer board & waterproofing $500 – $1,400 Cement board, liquid or sheet membrane, and the flood test that proves it holds
Shower pan / receptor $400 – $1,600 Pre-formed acrylic pan or a site-built tile pan with a proper slope to the drain
Wall tile & setting materials $900 – $3,000 Tile, thinset, grout, and the time to set it; porcelain sits low, natural stone sits high
Glass enclosure & door $500 – $2,200 Framed sliding door at the low end, frameless 3/8-inch glass at the high end
Fixtures & trim $300 – $1,200 Showerhead, handheld, grab bars, niche or bench if the plan calls for one
Finish-out & site close $200 – $600 Patch and paint where the old surround met the wall, caulk, clean site, walkthrough

Add those up and you get the working range: roughly $3,500 on a clean, straightforward swap and approaching $10,000 when the plumbing and tile work get serious. The single biggest swing is drain location. If the existing tub drain sits at one end of the alcove, which is common in Denton homes built in the 1980s and 1990s, and your new shower wants the drain centered, that’s a relocation – cutting and re-grading the drain line under the floor. It’s the right call structurally, but it adds real labor.

Glass is the second lever. A framed sliding door with obscured glass can be had for the price of a nice faucet. A frameless 3/8-inch enclosure makes the room feel twice its size, and it costs accordingly. The material itself is a documented brand – we install Kohler and Moen valves and trim as part of the standard specification, so what goes in your wall has a manufacturer warranty behind it, not just our word.

What Affects Tub-to-Shower Conversion Pricing in Denton

Six factors move a Denton tub-to-shower conversion up or down. Each is worth understanding before you compare bids – a low bid that ignores one of these is usually just a bid that plans to charge for it later.

  • Age and plumbing type. Homes along the older residential streets in central Denton often have cast iron drain stacks. A cast iron drain in sound condition is fine; a section that’s cracked or scaled shut has to come out during the conversion, which is a real line item. PVC drains from the 1990s on rarely need attention.
  • Wall substrate condition. Once the old surround comes off, the stud and backer board is exposed. Homes around the TWU campus and the older neighborhoods near the square sometimes show water damage behind the surround – soft studs, mold on the framing, or mortar that never cured right. Rebuilding that section adds labor, but skipping it means the new tile fails within the year.
  • Layout and footprint. A 60-inch alcove is the standard, and pricing reflects that. A 30-inch alcove gets cheaper on tile and glass; a 72-inch or a corner layout pushes the range up on both.
  • Drain relocation. Discussed above – the top single driver. When we quote a conversion, we look at where the drain sits and tell you up front whether relocation is in the price.
  • Tile and finish selection. Porcelain field tile is the workhorse. Natural stone, large-format slabs (24×48 or bigger), or a full-height glass or marble mosaic lifts the tile line item by hundreds to low thousands. The material choice is yours; we’ll quote both and let you decide.
  • Glass enclosure style. Framed, semi-frameless, and frameless run from about $500 to $2,200. It’s the fastest lever you can pull if the budget needs to hold.

Denton also has a soil and climate factor worth a mention. North Texas clay soil moves with the wet-and-dry cycle, and that movement shows up in bathroom floors over time. If a bathroom floor is noticeably out of level before the conversion starts, we build the pan to accommodate it – that’s a step most homeowners never think about, and it’s why we look at the floor before we quote.

For the bigger picture of how this fits with a full bathroom rebuild, our Denton bathroom remodeling guide walks through what the $9,000 to $28,000 remodeling range covers when the conversion is part of a larger job.

A remodeled family room with new windows and a window seat

What Does the 365-Day Done Right Promise Cover?

The 365-Day Done Right Promise is a written guarantee that stands behind every completed tub-to-shower conversion for a full year. If the work fails inside that window – a tile comes loose, the pan leaks, the valve drips, the glass doesn’t sit right – we return and correct it at no charge. It’s in writing, handed to you at job close, and it doesn’t hinge on whether you happened to notice the problem early.

That’s an unusual commitment in remodeling, where the industry default is a handshake and a hope. The reason we can offer it is that Bradford Remodeling Co Denton operates under The Garrison Standard, the framework our Garrison Partners family uses across every independently owned location. The Garrison Standard is simple: a written price before work starts, background-checked and uniformed technicians on every job, and a guarantee you can hold in your hand. The Garrison Code is the conduct standard underneath it – it’s why our technicians are background-checked before they’re on the roster, and why you know exactly who’s walking through your door before they arrive.

Every conversion closes the same way: clean site, documented scope, and a signed written guarantee in your hand. No loose ends, no “we’ll come back for that” that never happens. Live-person phone coverage 24/7 means if something isn’t right at 8 p.m. on a Saturday, you can reach us.

Tub-to-Shower vs. Alternatives: Where the Money Goes

Before committing to a conversion, it’s worth knowing how the price compares to other ways out of a tub you no longer use. These are the 2026 Denton ranges, and they’re consistent with what we quote for the same work under other service headings.

  • Tub-to-shower conversion: $3,500 – $10,000 (this page)
  • Walk-in shower installation: $4,500 – $12,000 – typically for a curbless or larger footprint build where there was no tub to swap
  • Shower replacement: $3,000 – $8,500 – a straight like-for-like shower refresh without changing the tub area
  • Full bathroom remodel: $9,000 – $28,000 when the conversion sits inside a larger floor, vanity, and lighting plan
  • Small bathroom remodel: $5,000 – $12,000 for a compact hall or guest bath

The conversion sits at the low end of the shower spectrum – it reuses the existing footprint and drain line in most cases, so you’re paying for finish work and a valve upgrade rather than a from-scratch build. If your bathroom has a separate shower and a tub you don’t use, a Denton shower replacement or walk-in shower installation may fit better than a conversion. If you’re weighing the whole room, our bathroom remodeling cost guide breaks the full range down.

And if the shower is part of a bigger plan – say you’re converting the guest bath and remodeling the kitchen in the same stretch of time – starting with the Kingwood service area style overview of how a whole-home remodel stages its trades is a good anchor for sequencing. Most homeowners convert one bath at a time.

How to Save on Tub-to-Shower Conversion

Six practical levers. None of them involve cutting corners on the waterproofing – that’s the one place where saving money today costs you a pan rebuild in eighteen months.

  1. Keep the drain where it is if the layout allows. The single largest savings, typically $600 to $1,400. A showerhead at one end of a 60-inch alcove is fine; many Denton homeowners assume the drain must center and pay for a relocation they didn’t need.
  2. Choose porcelain over natural stone. Porcelain field tile gives you the same visual range for a fraction of the tile line item. Save the stone for the accent niche and the shower floor if you want a natural feel.
  3. Go framed over frameless glass. A framed or semi-frameless enclosure saves $700 to $1,200 and looks right in many bathrooms. A careful frameless job makes a room feel larger, but it’s a genuine upgrade, not a requirement.
  4. Bundle the conversion with a vanity or flooring refresh. When the conversion is part of a larger job booked at the same time, the demolition, floor prep, and finish-out work share a crew and a set of trips. It’s the single biggest way to lower the effective cost of the conversion itself.
  5. Buy the fixtures to spec. Moen valves and trim on a documented brand spec means the manufacturer warranty covers the parts and our 365-Day Done Right Promise covers the install. Cheap fixtures with no warranty are the most expensive savings in the bathroom.
  6. Ask for the free estimate and the written price. No homeowner should have to guess what a conversion costs. Call (844) 651-3175 and ask for a written price before any work begins – that’s the standard, not a favor.

How Long Does a Tub-to-Shower Conversion Take in Denton?

Most Denton conversions wrap in 3 to 5 working days once demolition starts, assuming materials are on site and no hidden plumbing issue turns up behind the wall. A typical schedule looks like this:

  • Day 1: Demolition, tub removal, and a look at the framing and drain condition. If the plumbing needs work, this is when we find it.
  • Day 2: Rough plumbing, new valve, backer board and waterproofing. The flood test happens overnight to confirm the pan holds.
  • Day 3-4: Tile setting, grout, and the glass enclosure template if it’s a frameless door.
  • Day 5: Fixtures, caulk, paint touch-up, clean site, and the walkthrough with the signed guarantee.

The wildcards are drain relocation (adds a day), a custom glass order (manufactured in a shop, so there’s a lead time between template and install), and unexpected water damage behind the old surround. When we quote, we build those possibilities into the conversation so the written price isn’t a surprise at the end. That’s the whole point of the Garrison Standard.

The bathroom has to stay functional through the conversion – usually a second bath in the house. If that’s not an option, we schedule around it; call and we’ll plan the sequence.

Why Bradford Remodeling Co Denton

Bradford Remodeling Co Denton is an independently owned and operated member of the Garrison Partners family, established in 2004. Every location is held to the Garrison Standard, and Denton is no exception. The company connects homeowners with independent local professionals who perform the work, and our own discipline is what holds it together: a written price before work starts, background-checked and uniformed technicians, and the 365-Day Done Right Promise behind every completed conversion.

Our technicians have up to 22 years of experience, and the finishes we install come from a documented brand roster – Kohler, Moen, KraftMaid, and others – so what’s specified on the page is what goes in the wall. There’s no guessing which showerhead you’re getting. It’s on the quote, it’s the brand we said, it’s backed by the manufacturer’s warranty and ours.

You can reach a live person 24/7 at (844) 651-3175, and we answer before the second ring. If you’re ready to see what a Denton tub-to-shower conversion looks like for your bathroom, the free estimate is the place to start. For the broader picture of what we build in Denton, our home page covers the full service list, and the Denton service area page has the local detail.

FAQs – Tub-to-Shower Conversion Cost

How much does a tub-to-shower conversion cost in Denton?

A tub-to-shower conversion in Denton costs $3,500 to $10,000, with most standard alcove projects landing between $5,200 and $7,800. Drain relocation, tile selection, and glass style are the three biggest levers, and each is quoted in writing before work starts. Call (844) 651-3175 for a free estimate – the price we give you is the price you pay.

Is it cheaper to convert a tub to a shower or replace it?

Converting a tub to a shower usually costs more up front than a straight tub replacement – the conversion range runs $3,500 to $10,000 versus $1,200 to $3,500 for a like-for-like tub swap – but it delivers a usable walk-in shower for the life of the home. If the tub goes unused and access is the goal, the conversion is the better long-term value. For a like-for-like shower refresh without tub removal, our shower replacement cost range of $3,000 to $8,500 is the number to compare against.

Do I need a permit for a tub-to-shower conversion in Denton?

Yes – in most cases a plumbing permit is required when a shower valve, drain, or supply line changes. The City of Denton issues that permit through its development services office, and the inspection is completed before the walls close. We build permit costs into the written price, we call the inspection in before the tile goes up, and we’re on site when the inspector arrives. Never let a contractor skip that step to save time; the inspection is the only outside confirmation the plumbing was installed to code.

Can you do a tub-to-shower conversion in one day in Denton?

No, not responsibly. A one-day conversion usually means a pre-fabricated pan dropped into a rough opening with no flood test, no proper waterproofing, and no inspection. A proper Denton conversion takes 3 to 5 working days once demolition starts, and the waterproofing has to cure and pass its flood test before tile goes on. The speed you want is a crew that arrives on schedule and finishes on schedule – not a shortcut that fails inside the year. Call (844) 651-3175 for a realistic timeline in your bathroom.

What does the 365-Day Done Right Promise actually cover on a conversion?

It covers the finished work for a full year. If the shower pan leaks, a tile cracks or lifts, the valve drips, or the glass sits wrong within that window, we return and correct it at no charge – and it’s a written guarantee, signed and handed to you at job close, not a verbal promise. It doesn’t cover damage from misuse or a new leak in a separate plumbing line, but it does cover everything inside the conversion we installed. Call (844) 651-3175 with questions – the person who answers can walk you through it in plain language.

Can I keep my existing drain and save money on a Denton conversion?

Often yes, and it typically saves $600 to $1,400. If the existing tub drain already sits in a workable spot for the shower – usually a center drain in a 60-inch alcove – the conversion can reuse it with a new drain body and no floor re-grading. A pre-1970s home with a cast iron drain may need a section replaced during the conversion, and that’s quoted in writing before demolition. Call (844) 651-3175 and ask the person on the line to walk through what your current drain likely needs.

Get Your Written Price for a Denton Conversion

You should not have to call three numbers to get a single real number. Bradford Remodeling Co Denton gives you a written price before any work begins, on every conversion, every time – and we back it with the 365-Day Done Right Promise if the finished shower doesn’t hold for a year. Call (844) 651-3175 for a free estimate, and a live person will pick up – any hour, any day. If you want to compare the conversion against a full bathroom rebuild first, the Denton bathroom remodel page has the range, and the cost guide breaks it into line items. When you’re ready for your number, we’re ready to give it to you in writing.

Pricing reflects the Denton market as of 2026. Bradford Remodeling Co Denton offers free estimates – call (844) 651-3175.

Written by the team at Bradford Remodeling Co Denton.

What Our Customers Say

★★★★★ 4.8 from 6+ reviews

"Straightforward people who do what they say. The crew did what the contract said and called before changing anything."

- Dianne W.

"Primary bath redo. Tile is straight, shower pan was flood tested, and the vanity fits perfectly."

- Tricia S.

"Replaced old windows and trim while redoing the kitchen. Clean finish work."

- Ron F.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A dining nook with a built-in banquetteA home office with a built-in desk and shelvesAn open kitchen and dining area after a remodelA whole-home remodel with the living, dining and kitchen areas opened upA second-story addition that matches the existing rooflineA galley kitchen opened up to the dining room with a new peninsula

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in Denton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Denton team

A local vetted partner works across Denton and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Denton? Licensed & insured · free written estimates
Call (844) 651-3175

Request a Free Estimate

Tell us what's going on in Denton. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch